SO FAR –
The initial stage
Initial sketch was prepared and fundraising began
Community consultation
Cost for initial stage – £1,700
The development stage is complete
The project group commissioned a design by a Landscape Architect. The plan has now been finalised and ‘frozen’ ready for the building stage.
Fundraising paid for:
- Modification of the concept design in line with the community consultation report
- Preparation of detailed design drawings
- Preparation of the outline specification and establishment of the cost to build the pathway
Battle Town Council allocated funds for:
- Topographical survey
Cost for developmental stage – £4,200 inc. VAT (excluding topographical survey)
NEXT – the building stage …
- More fundraising for the community contribution towards the building costs (10% of the cost) so we are aiming for £22,000
- Secure capital funding
- Appoint contractors
- BUILD!
Cost to build – £310,000